The feedstock is read more desulphurized,blended with steam and converted to synthesis gasoline in the very best fired reformer furnace using nickel catalyst. Siemens Power will use an existing generation corridor that may be at present production gas turbines. “New production strains for your electrolyzers are increasingly being set up on 2,000